Bridgetown, Barbados Engine Construction

QED provided the equipment to unload, transport and place over 2,800 tons of equipment related to the construction of two 30 Mw slow speed diesel engines in Bridgetown, Barbados.  The project included two nine cylinder Hyundai engines with 50 Hz generators and heat recovery boilers. 

    Our 440 ton crane placing the boiler section

Intake Manifold Assembly

Nine Cylinder Frame Box

Boiler Assembly - 170 Tons

     

The Two Completed Engines Ready to Run