Bear Island, Florida Gas Conditioning Plant

Built to treat and stabilize the initial production from this site, this facility allowed an 800 bpd well to overcome temporary high hydrogen sulfide (H2S) contamination.  This plant utilized a modified oil stabilizer tower to strip H2S for disposal.  Once the well production stabilized and the H2S returned to manageable levels the equipment was removed.    

 

Back    Home    Contact Information