Bear Island, Florida Gas Conditioning Plant
|
|
|
Built to treat and stabilize the initial production from this site, this facility allowed an 800 bpd well to overcome temporary high hydrogen sulfide (H2S) contamination. This plant utilized a modified oil stabilizer tower to strip H2S for disposal. Once the well production stabilized and the H2S returned to manageable levels the equipment was removed.